Our Engineering Contribution
BESS 1
The project involves the construction of an electrochemical Battery Energy Storage System (BESS) integrated with a medium/high-voltage transformer substation, serving the production facilities and energy infrastructure managed by Carluccio S.r.l.
The scope of works includes:
> Preliminary, detailed, and executive design of civil and electromechanical works;
> Civil works for foundations, internal roads, and technical yard;
> Installation of the BESS, with modular containerized units equipped with HVAC and monitoring systems;
> Construction of the transformer substation, including MV/LV switchgear, transformers, and protection systems;
> Construction supervision and health & safety coordination during design and execution phases;
> Structural and electrical testing & commissioning, up to final handover and operation.