Our Engineering Contribution

BESS 1

The project involves the construction of an electrochemical Battery Energy Storage System (BESS) integrated with a medium/high-voltage transformer substation, serving the production facilities and energy infrastructure managed by Carluccio S.r.l.

The scope of works includes:

> Preliminary, detailed, and executive design of civil and electromechanical works;

> Civil works for foundations, internal roads, and technical yard;

> Installation of the BESS, with modular containerized units equipped with HVAC and monitoring systems;

> Construction of the transformer substation, including MV/LV switchgear, transformers, and protection systems;

> Construction supervision and health & safety coordination during design and execution phases;

> Structural and electrical testing & commissioning, up to final handover and operation.